2014-18 Facilities Projects Update

Location Description
  FY 2013-14 Projects Completed
Stanwood High Replaced boilers, controls, water heaters
Updated classroom lighting
Renovated stadium parking lot
Provided new facility to house file servers and backup systems and relocated fiber lines
  to new facility
Replaced stadium track surfacing and safety improvements
FY 2014-15 Projects Completed
Stanwood High Replaced lower, main gym bleachers
Repaired and refinished main gym and auxiliary gym floors
Replaced ceiling tile and repainted kitchen
Remodeled selected restrooms and implemented water conservation measures
Replaced tile and carpet in various locations
Resurfaced running track and repainted lines
Repaired compressed air system in shops
Replaced 123,000 square feet of roofing
Replaced roofing on two greenhouses
Renovated welding exhaust system
Sealed and painted exterior finishes
Replaced overhead doors in shop areas
Repaired and sealed exterior gym walls
Stanwood Elementary Replaced entire roof - 53,000 square feet
Painted building exterior 

  FY 2015-16 Projects Completed
Stanwood Elementary Replaced bell, clock, and intercom system
Remodeled all restrooms and implemented water conservation measures
Updated heating and ventilation controls
Replaced gym lighting
Updated classroom lighting
Replaced carpet in office area
Seal coated stucco exterior gym walls 
Twin City Elementary Replaced bell, clock, and intercom system
Rebuilt ventilation equipment, new heating controls
Replaced water heater
Replaced gym lighting 
Updated classroom lighting
Replaced 2nd floor carpet and stairwell flooring
Remodeled all restrooms with water conserving fixtures
Remodeled cafeteria table storage 
Refinished gym floor and repainted lines
Port Susan Middle  Replaced kitchen ceiling 
Updated food handling equipment
Installed Tackable wall surfacing
Replaced lighting in entry foyer and cafeteria
Replaced carpeting on second floor corridor 
Stanwood Middle New roofing on entire building
Remodeled two art rooms
Remodeled industrial arts room
Saratoga Remodeled and converted two Stanwood Middle School art rooms into general
   classrooms for Saratoga School use

FY 2016-17 Projects Completed
Cedarhome Elementary Updated heating and ventilation controls
Replaced gym lighting 
Replaced office area carpet
Installed two additional portable classrooms and ramps
Replaced roof on two portable classrooms
Repainted six and replaced carpet in two portable classrooms
Elger Bay Elementary Replaced gym lights
Repainted exterior finishes and covered play area ceiling
Seal coated and repainted lines on parking lot and play areas
Installed curbing around and added one climbing toy to play area
Painted exterior doors, jambs, and trim
Port Susan Middle Repainted exterior finishes as needed
Stanwood Elementary Playground safety update
New boilers and control system
Preschool restroom conservation
Stanwood Middle Overhauled gym air handler units (ventilation improvements)
Updated kitchen food handling equipment
Replaced leaking windows on southwest two-story section
Twin City Elementary Repainted exterior finishes and covered play area
Playground safety update
Tree removal (4) and pruning along north side of bus driveway
Utsalady Elementary Replaced gym lights
Repainted exterior finishes as needed
Replaced gym lights
Replaced main floor corridor and classroom vinyl floor tile

FY 2017-18 Projects - In Planning Phase
Elger Bay Elementary Replace vinyl flooring in selected areas
Twin City Elementary Install new sidewalk along bus driveway
Repair, seal coat, and paint asphalt areas
Utsalady Elementary Replace gym sound system
Seal coat and re-stripe asphalt
Cedarhome Elementary Repair, seal coat, and paint asphalt areas
 
Stanwood Elementary Seal coat and re-stripe asphalt
Port Susan Middle Renovate athletic fields to improve drainage and increase access during 
    wet weather

Stanwood Middle Seal coat and re-stripe asphalt
Replace 28,000 square feet of flooring
Stairwell improvements
Transportation (Bus Garage) Repair, seal coat, and restripe asphalt 
District-wide Painting, roofing, carpeting selected portable classrooms at various schools
FY 2019-2022 Replacement Levy Proposed Projects
(The replacement levy will be on the February 13, 2018 ballot)
Stanwood Middle Continue window replacement on east and north sides of the school and the single
   story southwest section
Cedarhome Elementary Playground safety improvements similar to those made at Twin City and Stanwood
   Elementary schools in 2017
Elger Bay Elementary Playground safety improvements similar to those improvements made at Twin City
   and Stanwood Elementary schools in 2017
Stanwood Elementary Replace fire alarm system
Twin City Elementary Replace fire alarm system
Utsalady Elementary Playground safety improvements similar to those improvements made at Twin City
   and Stanwood Elementary schools in 2017

Port Susan Middle  Replace entire roof and gutter system